Factory Preassembled Reel to Trench MMO Linear Anode Direct Burial System Reduced Field Labor Cost
Productdetails:
| Plaats van herkomst: | China |
| Merknaam: | High Broad or OEM |
| Certificering: | ISO 9001, Full Batch QC |
| Modelnummer: | MMO-RT-009 |
|
Gedetailleerde informatie |
|||
| anodetype: | Reel-to-Trench Voorgemonteerde MMO Lineair | Haspel opties: | Houten (export) / staal (retourneerbaar) |
|---|---|---|---|
| Standaardlengtes: | 100m, 200m, 500m per rol | Arbeidsbesparing: | Tot 40% vergeleken met montage op locatie |
| Inhoud: | Anode, kabel, opvulling, jas, splitsingen, trekkoord | QC: | In de fabriek getest, traceerbaarheid van batches |
| Markeren: | Reel naar loopgraaf MMO-anode,Voorgeassembleerde directe begraven CP,Anode-systeem voor het besparen van arbeid op het veld |
||
Productomschrijving
Reel-to-Trench MMO Linear Anode — Direct Burial System
Stop assembling anodes in the field. Our factory preassembled reel-to-trench system delivers complete, tested MMO linear anodes on deployment reels — pull, lay, connect, and bury. Field labor is reduced to three simple steps.
What's On the Reel
Every reel contains a complete, ready-to-install anode system:
- MMO/Ti anode wire — factory tensioned, no kinks
- Copper conductor cable — pre-connected at all splice points
- Coke breeze backfill — uniformly packed and contained
- Synthetic jacket — factory-sewn, seam integrity guaranteed
- All splice connections — epoxy sealed and Helium Leak Tested
- Pull rope and deployment instructions
Cost Comparison
| Item | On-Site Assembly | Reel-to-Trench |
|---|---|---|
| Labor (per 100m) | 16-24 man-hours | 4-6 man-hours |
| Splice Quality | Field-dependent | Factory guaranteed |
| Backfill Uniformity | Variable | Mechanically controlled |
| Weather Dependency | High | Minimal |
| QC Documentation | Limited | Full batch traceability |
Reel Specifications
Available in wooden (export) or steel (returnable) configurations. Standard lengths: 100m, 200m, 500m per reel. Custom lengths available.
Applications
- Large-scale pipeline CP projects
- Remote locations with limited skilled labor
- Fast-track construction schedules
- Projects requiring full QC documentation